Time, budget, and safety are almost always considered to be
1. Efficiency
2. Constraints
3. Trade-offs
4. Criteria

Respuesta :

IHaveAQuestion123
IHaveAQuestion123 IHaveAQuestion123
  • 01-07-2020

Answer:

The answer is option # 2. (Constraints).

Answer Link
helenabooth080
helenabooth080 helenabooth080
  • 01-07-2020
the answer is constraints
Answer Link

Otras preguntas

Which of the following is correct? 9:00 PM 9:00 P.M. 9:00 pm 9:00 p.m.
How did England ensure that it would profit from the crops raised in the British colonies? A. By passing the Townshend Acts B. By passing the Proclamation of 17
Question Find the slope of the line Slope - m Enter your answer as an integer or as a reduced fraction in the form A/B, Check Answer
We ask ourselves, Who am I to be brilliant, Gorgeous, Handsome, Talented And fabulous? Actually, who are you not to be? Explain why this phraze is so powerful.
What does Condemned mean? ​
ख) 'समय' कविता के अनुसार आपके जीवन का सबसे बड़ा धन क्या है एवं कैसे?T)​
If I were you, I would take advantage of the extra time you have
Why do the salt compounds in the blood dissolved and chemically reacted
Please hurry! Look image!!
A piggy bank contains 4 pennies, 7 nickels, 6 dimes, and 7 quarters. If a coin is chosen at random, which two coins are equally likely to be chosen? A. pennies