lidaralbany lidaralbany
  • 07-02-2019

Answer: 400 J

Explanation :

Given that,

Force = 100 N

Distance  = 6 m - 2 m = 4 m

Now , the work done is equal to the multiplication of the force and distance.

W = F * d

[tex]W = 100\ N\times 4\ m[/tex]

[tex]W = 400 J[/tex]

Hence, the quantity of work done is 400 J

Answer Link

Otras preguntas

The distance between Earth and its moon is 3.84 × 108 meters. Earth’s mass is m = 5.9742 × 1024 kilograms and the mass of the moon is 7.36 × 1022 kilograms. Wh
Why is acceleration negative in a free fall?
A circle is inscribed in a square. A point in the figure is selected at random. Find the probability that the point will be in the shaded region.
A drawer has 5 red socks and 5 socks.  If 3 drawn what is the probability that they are a match?
What is 1/4 of 1/2 of a pizza?
what is 36/63 in simplest form?
Find two consecutive even integers such that the lesser added to three times the greater gives a sum of 46.
where are mountains usually found?
my problem says"Write two ratios equivalent to 3:11
How did a cotton gin change agriculture in the south??