CarQuestionl8462 CarQuestionl8462
  • 14-11-2017
  • Business
contestada

The preferred method for situations involving strategic decision making, projects with a high degree of

Respuesta :

nicks20
nicks20 nicks20
  • 26-11-2017
I Found the answer on internet.

The preferred method for situations involving strategic decision making, projects with a high degree of UNCERTAINTY AND PROJECTS WITH AN UNSTOPPABLE SCOPE IS THE TOP-DOWN APPROACH. TOP DOWN APPROACH IS USED TO ESTIMATE PROJECT TIME AND COSTS.
Answer Link

Otras preguntas

challenges an acknowledge of how religious practices contribute to a healthy lifestyle​
The image of the point (-5, 3) reflected over the x-axis would be what
In a triangle ABC, if a = 13, b = 11, and c = 15, solve the triangle. Use degrees (deg) as the unit for all angles. Round answers to 1 decimal place.
Today, 5 friends went out for lunch. Their total bill was $23.80, including tax and gratuity. They decided to split the bill equally and each paid with a $10 b
Find the polar coordinate with (- pi )/(2)<θ <( pi )/(2) for the following Cartesian coordinates: If (x,y)=(3,-6) then (r,θ )=
A solution is made by dissolving 25g NaCl in enough water to make 1.0L solution. Assuming the density of the solution is 1.0g.cm³. Calculate the mass percent, m
What hormones does the adrenal medulla affect?
Which operation executes after the logical test in a for loop? 1) code block 2) iteration 3) initialization 4) update
Focaccia is considered a rich dough. a True b False
Any precontribution gain is allocated among all of the partners in their profit-loss ratio. A)True B)False