terryhgivens2917 terryhgivens2917
  • 15-10-2017
  • Mathematics
contestada

Strike out bowling balls produces 800 bowling balls per day using 2 workers who each work 8 hours per day. what is strike out's productivity?

Respuesta :

10102959 10102959
  • 15-10-2017
Each worker produces 25 bowling balls per hour 

Hope this helps!
Answer Link

Otras preguntas

Eliza goes to live on a Ranch near the Cosumnes River. What reference would you use to find out more about the location of this river? a) atlas b) an almanac
A 36 inch by 48 inch poster is reduced to an image that is 3 in by 4 inch in size. What is the scale factor? A: 1/3 B: 1/6 C: 1/9 D: 1/12
What is the discriminant of the quadratic equation 2x + 5x2 = 1? –18 –16 22 24
Write an equation of the line in slope-intercept form: 1) the line passing through (0,1) and (-4,5) 2) the line with slope -2.5 and passing through (2,1.5)
Read the excerpt below from act 4.3 of The Tragedy of Julius Caesar and answer the question that follows. BRUTUS: Remember March; the ides of March remember. Di
if you travel 75 miles in 1 1/2 hours, which of the following distance would you travel if you drove 5 hours
Which excerpt from Hurston’s “John Redding Goes to Sea” is an example of nonstandard English?
In which American colonies were cash crops raised for sale or export
What things below were invented or marketed in 1963 America? touch-tone phone Valium mini-skirt cassette player weather satellite eight-track player
What is the value of the expression below when p=1/8? 16p-10