ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

anyone help me with these two questions? need help quick! :D Which of the following statements is an example of climate? It is currently raining in Paris. Th
in which stage of the plot do readers meet the characters and become acquainted with the conflict
Explain why a food that has more calories will give a person more energy
Simplify √5(8+3√6) using radicals
Which of the following is an example of entrepreneurship? A.A woman accepts a job with a large corporation. B.A man buys flowers from a local gift shop. C.A wo
Jason bought some bags of green apples and some bags of red apples. He spent £4.20. 6 green apples for 75p 10 red apples for 90p. How many bags of each type d
consider a job that pays $100,000 per year federal income taxes 19% and state income tax is 7% what is the annual total of the required deductions of federal an
Which organelle has a double membrane
All of the following characteristics apply to these sea anemones except: a. they are free swimming. b. they are radially symmetrical. c. they have tentacles
This passage is from a petition submitted in 1607 to queen elizabeth i of great britain. why might the queen have rejected the petition and instead supported th