minayabarker minayabarker
  • 14-06-2017
  • Health
contestada

Which Of The following is not a important component planing ahead

Respuesta :

LebronJames23x
LebronJames23x LebronJames23x
  • 14-06-2017
The answer which is not an important component of planning ahead is constructing an inflexible plan. The plan needs to flexible and changed if necessary. 
Answer Link

Otras preguntas

Is saturated fats are an underconsumed nutrient
To make 6 dinner rolls 1/2 cup of flour is used. How much flour is needed to make 1 dinner roll? How much flour is needed to make 60 dinner rolls?
What does the face-off between father and son at the story's end speak to?
An 8-cylinder engine has a bore of 4.5 inches and a stroke of 4.5 inches. What’s the total piston displacement? A. 71.53 B. 472 C. 72 D. 572
What property is an acid-base indicator used to measure
Which sentence best states the main idea of this section of this chapter ? the city without us by alan weisman
what did the Virginia and new Jersey plans have in common
Find the range of f(x) = –2x – 5 for the domain {–2, –1, 1, 2}. {1, 3, 5, 7} {–1, –3, 3, 5} {–1, –3, 7, 9} {–1, –3, –7, –9}
A closed container has 4.02 ⋅ 10^23 atoms of a gas. Each atom of the gas weighs 1.67 ⋅ 10^−24 grams. Which of the following shows and explains the approximate t
Can someone help me with these questions?