cemil4liehopestered cemil4liehopestered
  • 04-05-2017
  • Business
contestada

Calculate the cost variance if the cumulative earned value is $10 and the cumulative actual costs are $20.

Respuesta :

cj605cj605 cj605cj605
  • 04-05-2017
$12 is the answer that you want
Answer Link

Otras preguntas

lines of levels were run requiring nn instrument setups. if the rod reading for each backsight and foresight has a standard deviation σσ , what is the standard
Your aunt bought a new television. The television screen is a rectangle. The length of the television screen is 54 inches and the width is 30.4 inches. What is
Help me please and thank you it’s financial literacy
Explain the dual system system of government. what was its impact on Bengal?
after struggling to solve a physics problem, you take a break for lunch. when you go back to work on the problem, the solution suddenly pops into your head. in
BCD is a straight line. Triangle ABC is equilateral. CE=DE Work out the size of angle x.
We observe that an emission feature in a star is shifted by 2 nm from its actual emission at 450 nm. How fast is this star moving with respect to us? Put answ
what decimal value does the 8-bit binary number 10000001 have if: (1) it is on a computer using two’s complement representation? (2) it is on a computer usin
calculate the perimeter of kite ABCD where AB = 29 cm and CD = 47 cm​
When was this source created?