andyshhhzzz23453 andyshhhzzz23453
  • 13-02-2022
  • Mathematics
contestada

If 4 electricians can wire some new houses in 20 days, how many electricians would be required to do the job in 10 days?
a. 30
b. 8
c. 45
d. 2

Respuesta :

frozenpods
frozenpods frozenpods
  • 13-02-2022

Answer:

2

Step-by-step explanation:

20/2 = 10

4/2 = 2

Answer Link

Otras preguntas

Which statement BEST contrasts the Ridge and Valley and the Coastal Plain regions of Georgia? A. The Ridge and Valley has some farmland, while the Coastal Pla
Which of the following is not characteristic of monopolistic competition? A) relatively large numbers of sellers C) production at minimum ATC in the long-run
I NEED HELP. using pythagorean inequalities, determine which is given triangle is acute.
How to justify each step in the solution of 5x+15=0
Rewrite the equation so that none of the values have a denominator and then solve the equation. 1/3x - 5 = 5/2x - 2/3 One strategy for solving the equation abov
Marianne and her children live in a neighborhood where all the families share their resources when someone needs help. The neighbors also consider themselves to
A submarine was situated 1000 feet below sea level. If it ascends 850 feet, what is its new position?
Place the following biological processes in order from smaller to larger according to the scale at which they would be studied. 1. A cell reproduces by divid
A 0.805-kg block oscillates on the end of a spring whose spring constant is k = 40.0 N/m . The mass moves in a fluid which offers a resistive force F=−bv, where
Given the Sequence 15,0 -15 -30 identify the pattern