ambikathapa2010 ambikathapa2010
  • 12-02-2022
  • Mathematics
contestada

sanaya can do 1/3 part of a work in 1 day and chahanaa can do1/4 part of the same work in 1 day .How much work would they do working together​

Respuesta :

nyajahdonawa811 nyajahdonawa811
  • 12-02-2022

Answer: 36/5= 7.2 days to complete sanaya work day

Step-by-step explanation:

Answer Link

Otras preguntas

multiply these measurements using significant digit rules: 1.27kg x 9.8m/s
a. Calculate the pH of a solution that has [H3O+]= 4.3 x 10-5 M. b. Is the solution acidic or basic? How do you know?
How did imperialism contribute to World War I
Which is the most effective paraphrase of this excerpt? A. Odysseus traveled simply so that he could find his shipmates and bring them home safely B. Odysseus l
You are given the steps for constructing the bisector of an angle using a compass and a straightedge. Arrange the steps in the correct sequence
In Leakwater township, there are two plumbers. On a particular day three Leakwater residents call village plumbers independently of each other. Each resident ra
What are the slope and y-intercept of the linear function graphed to the left? O slope: -2; y-intercept: 2 Oslope: -y-intercept: 1 O slope: :y-intercept 2 O slo
Discriminants - Check picture! (Will mark Brainliest for correct answer)
Adriana gather data and different schools winning percentages and the year average year salary of their head coaches is in millions of dollars in the years 2000
The formula for the volume, V, of a cone having the radius, r, and the height, h, is shown below. V=1/3πR^H Write the formula to calculate the height, H. PLEASE