A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Which character from the crucible best represents the common archetype or the well respected?
given T(-5,8,3) and M(-2,-1,-6) find the ordered triple that represents TM. Then find the magnitude of TM.
Newton’s third law of motion says that for every action an And opposite reaction
How did the Vietnam War affect immigration to the United States in the 1970s? -Asian immigration increased because many Vietnamese people escaped the chaos and
What makes some of the rivers in Texas “wrong way” rivers?
A regular hexagonal prism has a height of 12 cm and base edge length of 10 cm. Identify its lateral area and surface area. L = 620 cm2 ; S = 942.6 cm2 L = 720 c
This question is called "Create equations to solve for missing angles"Help me!! Its very confusing.​
A box contains 12 balls numbered 1 through 12. Two balls are drawn in succession without replacement. If the second ball has the number 4 on​ it, what is the pr
L ES DEVICES 15. Which of the following statements is true? A.)Complex sentences have many clauses. B.)Complex sentences have difficult vocabulary. C.)Complex s
Rights and freedoms that cannot be taken away are called? A. Laws B. Rules C. Civil Liberties D. The Bill of Rights