When looking at a program board at the end of program increment (PI) planning, what does it mean when a feature is placed in a team's swim lane with no strings

Respuesta :

IfeanyiEze8899 IfeanyiEze8899
  • 04-01-2021

Answer:

It simply means that other teams can independently complete the feature.

Explanation:

PI or program increment is a planning interval during which an agile release train (ART) plans and produces working and tested software and systems. It takes a duration of 8 to 12 weeks

Agile teams can access and independently complete various ARTs found in their swim lanes with no strings.

Answer Link

Otras preguntas

How would an organisms homeostasis be affected if it was not able to produce enzymes
Based on the context, what is the most likely definition for "Triviality"
Which is smaller, -5 or -17?
What's 4.5 as a fraction?
Why doesn't a ball roll forever after being kicked at a soccer game!
y=-2x-9 y= 2x-1 how to find x and y
Name 5 fractions that are near, but not equivalent to 4/12
The narrator is struck by roderick’s excessive nervous agitation. however, he had been prepared for something like this. what had prepared him?
Ten runners join a race. In how many possible ways can they be arranged as first, second, and third placer? Pls answer
if there is an open circuit which of the following could be used to complete the circuit?