nrw7r2fyve nrw7r2fyve
  • 02-11-2020
  • Mathematics
contestada

A painter can finish painting a house in 8 hours. Her assistant takes 10 hours to finish the same job. How long would it take for them to complete the job if they were working together?

Respuesta :

ecamarda ecamarda
  • 03-11-2020

Answer:

4.44

Step-by-step explanation:

8 times 10/8+10

80/18=4.44

Answer Link

Otras preguntas

Please help. It due in less than an hour.
The toes are posterior to the heel true or false
What is the equation of the following graph?
Um don’t worry about the answers in the boxes those are obviously wrong please helpppp
refers to the massive database known as medical records. a. Health and medical records database b. Database c. Medical records database d. Health information te
2/5h + g = d (solve for h) please show work, thanks!
can somone help me with this please
The perimeter of a triangle is 137 cm. If three sides of the triangle are x + 7cm, 2x - 5 and 3x - 3 cm, what is the length of each side ?
Significant Figures Worksheet 1. Determine the number of significant figures in each of the following: (a) 5.432 g 4 sig for (b) 40.319 g 5 sight (C) 146 cm 3 s
how much we can expect to earn by having petroleum engineer degree with PhD?​