Which field can be used to track the progress on tasks that a user has created?
Subject
Start Date
Due Date
% Complete
Help plz

Respuesta :

elitrad
elitrad elitrad
  • 03-07-2020

Answer:

% complete

Explanation:

% complete tracks progress (how far done you are, aka completion)

Answer Link
deliaaaxox deliaaaxox
  • 07-07-2020
Percent complete will be used to track progress on task that the user has created :))
Answer Link

Otras preguntas

Pablo le dio consejos a su hermana para su viaje, pero cambiaron sus planes y ahora él va a ir con ella. Cambia el mandato informal a un mandato de nosotros. El
please help im timed
Write as an inequality. Do not solve. Yellow Cab charges a flat rate of $3.00 plus $0.50 per mile. Raven has $20.00 to spend on a cab ride. Write an inequality
A 25-foot ladder is leaning against the side of a house so that the bottom of the ladder is 15 feet from the base of the house. Will the ladder reach a window t
Write an equation in point-slope form for the line that passes through the given points. (-4,7). (6.3)
your company is considering updating several electronic devices used in the enterprise network. the third-party service provider that your company approached sa
graph this function f(x) = 1/4(x) - 7
A guitar string that plays a very low note is eleven hundredths of an inch thick lesson 8 session 4
Identify the hybridization of the N atoms in N2H4
You are holding a kite string in your hand. The angle of elevation from your hand to the kite is 66 degree and the distance to the kite is 303 feet. Your hand i