adoflotorres adoflotorres
  • 03-07-2020
  • Computers and Technology
contestada

Which field can be used to track the progress on tasks that a user has created?
Subject
Start Date
Due Date
% Complete

Respuesta :

connerb333 connerb333
  • 08-07-2020
All of these are correct and what Would work best is a % Complete_ at what this would do is show a 0-100 completion rate
Answer Link
babyyyjadee babyyyjadee
  • 30-10-2020
All of them would work but the most efficient one would be % complete
Answer Link

Otras preguntas

what state did not agree to stop trade with england
please help me understand
Help pleaseee!!!!!!!!!!
Do you think A trump should be elected or B biden should be elected?
which of the following is an example of positive feedback?
please i need help fast
what is the four noble truths​
A rectangle has a perimeter of 80 feet. The length, L, is 4 feet more than the width, w, of the rectangle. Which expression can be used to represent the length
64% of x is 140 please help me right away and solve me x!
which is the first step when multiplying or divided mixed numbers