nepalkichori12 nepalkichori12
  • 03-07-2020
  • Mathematics
contestada

5. A worker can do a piece of
piece of wook
in 14 days.
How much coook does he do ini day!
. How much work does he do in 7 days?
lijIt he works for 2 days and leaves,
how much work is left to finish it?

Respuesta :

Sueraiuka
Sueraiuka Sueraiuka
  • 03-07-2020

Answer:

therefore the left work of worker will be 6/7 part of work

Ver imagen Sueraiuka
Answer Link

Otras preguntas

i need help with math 1010completing the squarex^2-9x=10
True or false: Most of a breaker' s energy is concentrated along beaches.
Between which pair of numbers is the exact product of 379 and 8?
The accumulation of small changes in a gene pool over a relatively short period is called: A: anagenesis B: cladogenesis C: microevolution D: punctuated equilib
both chloroplasts and mitochondria are like in that they both have inner membranes and their own blank.
Born as Saul, his name is known as _________ and he spent his entire life after conversion spreading Christianity.
22 is 44% of what number?
what is value of digit 4 in 1.848 meters in decimal and fraction
What is 0.2 as a whole number?
Multicellular plants and animals have organs to perform specific functions. What do eukaryotic cells have to perform specific functions? A.ribosomes B.organelle