erterry8692 erterry8692
  • 16-04-2020
  • Business
contestada

Predetermined overhead rates in traditional costing are often based on

Respuesta :

andromache andromache
  • 19-04-2020

Answer:

a) direct labor cost for job order costing and machine hours for process costing.

Explanation:

As we know that the predetermined overhead rate is the rate which is to be computed by considering the total estimated manufacturing overhead cost and the estimated activity level i.e machine hours, etc

Under the traditional costing, in case of job order costing it ts based on direct labor cost while in the process costing it is based on machine hours

Hence, first option is correct

Answer Link

Otras preguntas

Algebra. View the picture and help please..
what is 350 over 100 in simplest form
what is the metaphor in the sentence "time was the great millstone, which ground is to dust like kerneled wheat?"
What accounts for why the Soviet Union decided to formalize its East European alliance through the Warsaw Pact? to convince the world that communism was the bes
radius: 12 diameter: 24 inches circumference: area:
similes in divergent with page numbers?
4. Which structures are used by the cell for storing and maintaining biological information that will be passed to daughter cells when the cell divides? a. nucl
1. In "In the Shadow of War", Omovo follows the soldiers and the women most likely because he (1 point) A. Yields to the curious whims of boys his age B. hopes
what is 350 over 100 in simplest form
Can you express 9/9 as a mixed number