A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

which structure of eye like as a magnifying glass?A) Lens B) Retina C) Pupil D) Cornea​
How did the building of railroads across America contribute to the country's economic growth
SUMMARIZE According to some scientists, how and when did Asians first migrate to the Americas?
In the Middle Ages, most scientists believed that the world was made from four simple elements and that almost everything was a mixture. Which type of pure subs
Written as a simplified polynomial in standard form, what is the result when (2x + 8)2 is subtracted from 8x2 – 3?​
Gravitational potential energy (Eg) and kinetic energy (Ek) A 70.0 kg athlete is running at a 12m/s in the 100.0m dash. What is the kinetic energy of the athlet
3*2^20-5*2^19/(-2^6)^3 calculate ITS NOT 3145738
Writs 5 points on South America biomes
At which location would an object's weight be the greatest On Pluto On Earth On the Sun On the Moon
A leader is responsible for A designating team members to do specific tasks B. doing all the work on a project alone C making sure that all the work on a proje