Answer: Hold to ready

Explanation:

This is when the process is waiting to be assigned to a processor. And this is carried out by the short term scheduler, so it can run. This state is immediately after the new state for the process.

Answer Link

Otras preguntas

Brad has recently increased his weekly intake of omega-3 fatty acids. Over time, which of the following effects would he likely NOT experience? a) reduction in
Can you help me with this please
Terry,Sasha, and Harry each chose a number.Terrys number is 10x as much as Sasha’s. Sasha’s number is 0.4. What number did each person choose?
Which of the following set of pictures includes only molecules?
14.25 devised by1.9 what is the answer
Show that 2^2n-1 +1 is divisible by 3 for all n > 1.
MARK AS BRAINLEST! 5 + x = 5
For a standard production car, the highest roadtested acceleration ever reported occurred in 1993, when a Ford RS200 Evolution went from zero to 26.8 m/s (60 mp
Animals, including humans, produce antibiotics in response to an infection. a. True b. False
Microsoft Xbox operating system provides Xbox programmers with a set of common standards to use to access controllers, the Kinect motion sensor, play sounds, dr