cricecrice6100 cricecrice6100
  • 12-02-2020
  • Social Studies
contestada

Task level and project level charts are both prepared by the same person, usually the project manager. True False

Respuesta :

bratislava bratislava
  • 16-02-2020

Answer:

True

Explanation:

  • The project manager is accountable for the activities that result n the end results also maintain the progress. And the mutual interaction of the tasks of various parties and reduces the risk of the failure and maximizes the benefits and reduces the costs.
Answer Link

Otras preguntas

50 decreased by twice a number
What conflict drives the action forward in Romeo and Juliet? A. an ongoing argument between Mercutio and Romeo about women B. an ancient feud between the Montag
what is the direction of velocity of an object moving along a circular path??
Which country has the highest population in Africa? Niger Cape Verde Ghana Nigeria
Round 99.49 to the nearest whole number
Write an addition expression to describe the situation then find the sum and explain the meaning. An actor gains 20 pounds for a part and then loses 15 pounds
Which country has the highest population in Africa? Niger Cape Verde Ghana Nigeria
Which pair correctly uses a hyphen? A. Four-million B. Two-thousand C. One-hundred D. Three-fifths
Which two words below are using the hyphen correctly? A. Ex-husband B. Pre-school C. Self-evident D. Re-tell
Why does George Orwell present Animal Farm as a fable? A. to show what a perfect society would be like B. to make a moral point at the end of the story C. to po