which software development team memeber is responsible for the timeline and budget

Respuesta :

bentuzene
bentuzene bentuzene
  • 17-01-2020

Answer:

The Project Manager

Explanation:

This person's job is to manage the project budget and map out how much time would be spent on each phase. Also his/her job is to ensure that all deliverables and on time.

Answer Link

Otras preguntas

What did the Puritans of Massachusetts hope to create?
Napoleon's Continental System was designed to __________. reform the French judicial system strengthen France's commercial connections with the United States pr
Which of the following rights would be considered a POLITICAL right? minimum wage employer-provided health care equal pay for equal work fair trial
If f(x) = 2x2 − 10, find f(5). 90 10 7.5 40
Which of the following is considered a xanthine? a. Acetylcysteine b. Guaifenesin c. Theophylline d. Epinephrine HCL
The results of improved agricultural practices include all of the following except _____.
Which of the following was a prominent Federalist
Which of the following was a prominent Federalist
Which literary term describes one form of a fourteen-line lyric poem? a. epic poem b. epigram c. Italian sonnet d. narrative poem
If f(x) = x3 – 2x2, which expression is equivalent to f(i)?