Sadeghshakeri97 Sadeghshakeri97
  • 02-12-2019
  • Mathematics
contestada

60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

Which of these artistic values is most apparent in the paintings of Hieronymus Bosch? A. Grazia B.Idealism C. Symbolism D.Simplicity
write a paragraph on weather or not the driving age should increase
The soil barriers help conserve soil by keeping soil A) from moving. B) safe from pests. C) from drying out. Eliminate D) rich with nutrients
Which of the following biomolecules tipically contains both nitrogen and phosphate
Please help!! Which problems have rapid industrialization and economic development contributed to in Sub Saharan Africa? Select all that apply. A) decline in ex
PLEASE HELP!!!! 20 POINTS!!!!
This was a youth-centered organization of the 1960s whose purpose was to nonviolently foster a "participatory democracy"? in the us that would end wars and raci
After about 10 years, Reconstruction collapsed after a political deal. Many of the social reforms were reversed. Can you think of anything that could have kept
Which answers are equivalent to ? Choose all answers that are correct. A. 0.08 B. 8% C. 0.32 D. 32%
How to find a vector from magnitude and direction?