​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

Write the equation of the line parallel to y=8x-1 that contains the point (-6,2)
How would you sole this equation if you were solving for x ? 6x-2x+7=23
Who becomes Meimei`s new adversary in chess? Why must she find someone else to play against
Read the passage. excerpt from "Remarks on East-West Relations at Brandenburg Gate in West Berlin" by Ronald Regan Beginning 10 years ago, the Soviets challenge
A class has 21 girls and 12 boys. What is the probability that a boy's name is drawn at random?
if x is 12 and y is 7. What is the slope
The formula unit CsO, ALS,RbI, or BeCl is neutral
A restaurateur spends $61 on labor and materials to produce 8 meals. by increasing these costs to $78, he can produce 14 meals. by increasing costs to $95, he c
How did the domino theory influence the United States' role in the Vietnam War?
isolate y in the equation 3x+2y=8?