aliyucivil1982 aliyucivil1982
  • 04-08-2019
  • Engineering
contestada

Estimate the quantity of soil to be excavated from the borrow pit​

Respuesta :

lola2487
lola2487 lola2487
  • 04-08-2019

Answer

1056

Explanation:

for example

A soil is to be excavated from a borrow pit which has a density of 1.75g/cc and water content of 12%. The G is 2.7 the soil is compacted to that water content of 18% and dry density of 1.65g/cc. for 1000 m3 of soil used in fill estimate

Quantity of soil to be excavated from pit in m3

Answer Link

Otras preguntas

How many people on food stamps have iphones?
Why should a speaker carefully consider his or her audience? A. Most speakers do not consider their audience, just the argument that they want to make. B. Most
I need to remember how to solve for x when i’m being asked a question like this
Is 1.31944444 closest to 1, 2, or 3 and why?
What would you have done if you had been the pilot in “The Cold Equations”? Explain your answer in three to five sentences including examples from the story.
A friend tells you that plants grow and gain mass only because of the nutrients they pull out of the soil. It this statement true? Explain your answer in detail
How much longer is 3 meters than 3 yards?
Mental illness and mental health imply that psychological disturbance or abnormality is like a ____ (fill in the blank) WILL MARK BRAINLIEST.
How do I find what “x” equals?? Please help this is due very very soon!!
Simplify the expression 6×2/(-14) + 9 × 2