treicyro treicyro
  • 11-04-2024
  • Mathematics
contestada

A sawmill cuts boards for a lumber supplier. When saws A, B, and C all work for 7 hr, they cut 9450 linear board-ft of lumber. It would take saws A and B working together 12.6 hr to cut 9450 ft of lumber. Saws B and C can cut 9450 ft of lumber in 9 hr. Find the rate (in ft/hr) that each saw can cut lumber.

Respuesta :

Otras preguntas

In the early to mid-1800s, the communities located in the South were mostly what? A. Suburbs B. Rural C. Urban
what do elements in a same group share
Explain two different chemical properties of matter.
Question 13 cos(546) + abs(-78) = ?
the bearing of town from town275 - 1803. The barnoint BA А.4. medtheExample 5Adoa is facing East through how manydegrees should she tum to tace North?SolutionSh
Is the following statement sometimes, always or never true: Compounds can be broken down into elements by physical means.
BEST ANSWER GETS BRAINLIEST 5 STAR FOLLOW AND THX Which of these was a belief of the Loyalists? Group of answer choices: A. Being part of a strong empire was b
ANSWER CORRECT AND GET BRAINLIEST
Find the radius of the circle if the center is at (1, 2) and the point (-5, 6) lies on the circle.
Determine the momentum of a 6 kg object moving at 5 m.s-1 to the right