jaejaeJae5760 jaejaeJae5760
  • 14-03-2024
  • Engineering
contestada

Lead time for cakes is 4 days with daily demand of 30 cakes and a safety stock of 4 days. Each container (kanban) holds 20 cakes. What is the correct number of kanbans?
A) 8
B) 20
C) 6
D) 12

Respuesta :

Otras preguntas

what alkanes is CH3-CH2-CH-CH3-CH3
Vector a has a magnitude of 3 and a direction of 20° nw. vector b has a magnitude of 5 and a direction of 30° ne. what is the magnitude of the sum of these two
A disk 40 cm in diameter and 5 cm thick is to be cast of pure aluminum in an open mold casting operation. the melting temperature of aluminum = 660c, and the p
Why did people migrate from Asia to the Americas
What are the key differences between using a deerskin as money and using a dollar bill as​ money? a. Using a deerskin as money incurs a much larger transactions
-0.75 - (-2/5) + 0.4 + -(3/4)
What is the equation of the line in slope -intercept from that is perpendicular to the line y=3/4x-2 and passes through the point (-12,10) ?
Which of the following inventions described the unique feature of the first movie camera, invented in 1897? It used color film. It could shoot 3D movies. It
Which sentence has a adjective clause
Subtracting 6 from the product of 5 and a number results in the number added to 30.