EAspitzer6241 EAspitzer6241
  • 12-03-2024
  • Business
contestada

The longer the processing time, _____ to ensure demand is less than capacity.
A) increase production efficiency
B) decrease production efficiency
C) maintain current production levels
D) ignore demand fluctuations

Respuesta :

Otras preguntas

A force of 200 N is required to keep an object sliding at a constant speed of 2 m/s across a rough floor. How much power is being expended to maintain this moti
What is MULTIPLIED to equal 80 but can be ADDED to make NEGATIVE 21
help calculate 6x+14=32
7 qt. 2c. =______ c.
Katrina has 8 ribbons for her hair.3/4 of the ribbons are blue.how many of Katrina ribbons are blue.could u show me how 2 find the answer..
Round 1.0649 to the nearest thousandth
Which requires the removal of heat, melting or freezing?Is it evaporation? What is it? Why?
the water pipe has a radius of 5 cm and a height of 7 cm. what volume of water does it take to fill the pipe?
If the potential energy and the kinetic energy are not the same, where did the leftover energy go?
How much work does a mother do if she lifts each of her twin babies upward 1 meter? Each baby weighs 90 newtons.