osayword847 osayword847
  • 14-02-2024
  • Engineering
contestada

No NOTAM action is required for NAVAIDs (TACAN, VOR, etc.) that are part of the National Airspace System if the time periods do not exceed ____.
a) 24 hours
b) 48 hours
c) 72 hours
d) 96 hours

Respuesta :

Otras preguntas

The following statements about carbon dioxide are true EXCEPT a. It can be prepared by the action of acid on CaCO₃ b. It is used in fire extinguishers c. It d
what does the zeppelin
A bottle rocket that was made in science class had a trajectory path that followed the quadratic equation y=-x^2+4x+6. What is the turning point of the rocket's
what is the cell cycle??
what colors are birds are attracted 2
Many colonial people volunteered to fight for the Allied forces because they hoped their service would win their colony's ____
Is STM semantically or acoustically encoded??
what are some reasons for limiting authority
How many heart chambers does a shark have?
which inequality is equivalent to 7x-2y> 8. A) y> 7/2x+8 b) y>-2/7x+8/7 c) y <7/2x-4 d) y <-2/7x-4/7 (whats a Inequality? )